NOMICRamp

Learn

Why watching normal work finds the risks that incident reports miss, and the model NOM uses to make the ramp safer. Short answers; the research page has the detail.

What is Normal Operations Monitoring?

Normal Operations Monitoring is a way of learning about safety from normal work. Trained observers from the workforce watch normal turnarounds and record what they see: the conditions the ramp team works in, how work as done differs from work as imagined, how the team handles problems, and how the turnaround ends. Because it looks at many normal days rather than a few bad ones, it shows patterns that incident reports miss.

It comes from Line Operations Safety Audit (LOSA), the flight deck programme airlines have trusted for more than two decades, recommended by ICAO and the FAA. LOSA showed that peer observers, a promise of no jeopardy and careful data checking give a true picture of normal operations. Ramp versions followed, and a PhD at UNSW Aviation tested the approach on more than a thousand turnarounds. NOMIC Ramp is that work, rebuilt for today.

Work as imagined and work as done

Work as imagined is how the work is meant to go: the procedures, the loading instruction, the schedule, the training. Work as done is how it actually goes on the day, with late freight, a missing loader, a short team or a bay that isn't ready. There is always a gap between the two, and that gap isn't a failure: people adjust to get the job done safely. Normal Operations Monitoring makes the gap visible, so the organisation can see where work as imagined needs to change, and where people are quietly holding the system together.

Work asimagined procedures, plans,loading instruction,training Work asdone what reallyhappens onthe ramp where theymatch Threats push them apart Variations: how the team closes the gap
NOMIC Ramp records both: what made the work harder, and what the team did to keep it safe and on time.

The NOM model

NOM is built on the LOSA Threat and Error Management model, redeveloped for the ramp. Threats are conditions in the environment that may increase risk. Variations are where work as done differs from work as planned or prescribed, with no cause inferred. Each one is managed (resilient action resolves it), unmanaged (no action) or mismanaged (action that doesn't work). NOM also records the enablers that support work going well.

The NOM model Inside the gap between work as imagined and work as done, threats and variations are managed, unmanaged or mismanaged. Unmanaged or mismanaged ones can pass through defences to an undesired state, and on to an incident or accident. Managed ones return the operation to normal. Work as imagined The gap between work as imagined and work as done Work as done Conditions Enablers Threats managedunmanagedmismanaged Actions Variations managedunmanagedmismanaged Defences Outcomes Desired state Undesired state managedunmanagedmismanaged Defences Defences Incidentor accident back to normal
The NOM model. Red: how unmanaged or mismanaged threats and variations can get through the organisation's defences to an undesired state, and on to an incident or accident. Green: where managing it returns the operation to normal.

Safety-I and Safety-II

Safety-I asks why things go wrong and tries to reduce what fails. Safety-II asks why things usually go right, and tries to support and expand what makes them go right. The ramp needs both: like playing defence and offence at the same time.

NOMIC Ramp puts Safety-II first, with Safety-I inside it:

The ten LOSA operating characteristics, on the ramp

LOSA is defined by ten operating characteristics (ICAO Doc 9803). They are why crews and managers trust it. NOMIC Ramp keeps all ten:

LOSAIn NOMIC Ramp
1. Jump-seat observations during normal flight operationsObservers watch normal turnarounds from arrival to pushback, never after incidents or as checks
2. Joint management and pilot sponsorshipManagement and the ramp workforce (and unions, where there are any) sign the agreement together
3. Voluntary crew participationThe crew are told before each observation and can say no
4. De-identified, confidential, safety-minded data collectionNo names, staff numbers, flight numbers or registrations; never used for discipline. On-time is reported separately from safety and never by crew, shift or observer
5. Targeted observation instrumentA form and code list made for turnarounds, from ramp research
6. Trusted and trained observersRamp people, trained with practice exercises and checked for agreement before they start
7. Trusted data collection siteObservations are encrypted with the organisation's own key, on the phone, before they go anywhere
8. Data verification roundtablesThe checking group reviews every observation's coding before it counts
9. Data-derived targets for enhancementExpand and Shrink findings, and a Learning Team pack for each
10. Feedback of results to the lineResults go back to ramp crews first, who help decide what changes; the next round measures it

What's new compared with LOSA

Everything people value in LOSA stays. What changes:

If you use Threat and Error Management

The thinking is the same; some words are gentler, so observers record what they see without judging it and crews keep trusting the programme. The management terms are kept, because the industry knows them.

TEM and LOSANOMIC Ramp
ThreatThe same, plus enablers
Error, violationVariation: where work as done differs from work as imagined, with its purpose if visible
Undesired aircraft stateUndesired state
Managed, mismanaged, unmanagedThe same
CountermeasuresGood practice: Plan, Coordinate, Adapt, Learn

The person who runs the loading at the aircraft has many names: leading hand in Australia and New Zealand, crew chief or lead in North America, team leader in parts of Europe. NOMIC Ramp uses IATA's term, loading supervisor.

Public sources

A ramp worker placing safety cones under an aircraft wing
Work as done is full of small things that keep the turnaround safe and on time.

Alongside IGOM, ISAGO and Ramp LOSA

NOMIC Ramp adds to your procedures, audits and safety management system rather than replacing them. See how it fits, and LOSA, Ramp LOSA, GOSA and NOM for the family it comes from.